This is a replacement E-Flite “Long Lead” 6 Amp ESC for the Mini Convergence Electric Airplane. This ESC is also available with regular length leads (EFLA9313).
This product was added to our catalog on August 23, 2018
$26.99 Original price was: $26.99.$16.19Current price is: $16.19.

This is a replacement E-Flite “Long Lead” 6 Amp ESC for the Mini Convergence Electric Airplane. This ESC is also available with regular length leads (EFLA9313).
This product was added to our catalog on August 23, 2018
Airplanes
4s (14.8v)
Reviews
There are no reviews yet.